我看字典>英语词典>contractor翻译和用法

contractor

英 [kənˈtræktə(r)]

美 [kənˈtræktər]

n.  承包人; 承包商; 承包公司

复数:contractors 

TOEFLTEM4TEM8BEC化学

Collins.2 / BNC.4160 / COCA.3745

牛津词典

    noun

    • 承包人;承包商;承包公司
      a person or company that has a contract to do work or provide goods or services for another company
      1. a building/haulage, etc. contractor
        建筑、货运等承包商
      2. to employ an outside contractor
        雇用外来承包商

    柯林斯词典

    • N-COUNT 订约人;立约人;承包商
      Acontractoris a person or company that does work for other people or organizations.
      1. We told the building contractor that we wanted a garage big enough for two cars.
        我们告诉建筑承包商,我们需要一个能容得下两辆车的车库。
      2. ...a major US defense contractor.
        美国国防设施建设的主要承包商

    英英释义

    noun

    • a bodily organ that contracts
        Synonym:contractile organ
      1. someone (a person or firm) who contracts to build things
        1. (law) a party to a contract
          1. the bridge player in contract bridge who wins the bidding and can declare which suit is to be trumps
              Synonym:declarer

            双语例句

            • It criticises the main contractor for seriously erring in its original estimates
              它批评主要承包商在其最初估价中犯了严重的错误。
            • The Contractor shall notify the subcontractor of the delegated duties and authority of this contractor's representative.
              总包商应将总包商代表的委任职责和权限通知分包商。
            • However, lawful inducements and rewards to Contractor's Personnel shall not entitle termination.
              但对给予承包商人员的合法鼓励和奖赏无权终止。
            • The Contractor shall attach to this report any other information that he considers relevant.
              承包商应将其认为相关的任何其他信息附加到报告中。
            • Contractor shall evaluate supplier's capabilities to meet the technical, quality and schedule requirements of the work.
              承包商应评估供应商满足工程技术、质量和时间要求的能力。
            • The Contractor shall provide methods and means of handling that prevent damage or deterioration.
              承包商应提供预防损坏和损耗的处理方法和方式。
            • Contractor shall be totally responsible for the quality of work required by this contract.
              承包商应总体负责本合同规定工程的质量。
            • This part shall be responsible by HVAC contractor.
              此部分将有空调及排风系统的承包商负责。
            • This Contract shall be altered or supplemented only by mutual consent in writing between the Owner and the Contractor.
              对本合同的任何修改或补充,须经业主和承包商双方的书面同意。
            • Manage and supervise the instrument installation contractor and in accordance with the contract scope specifications standards and construction drawings.
              管理和监督设备安装承包方的工作,并确保其符合承包合同规定的范围,规格,标准和建筑制图。